Crane services (VAT included)

Further details on  : +33(0)5 46 44 91 16 or grutage@portlarochelle.com

The rates are calculated L.O.A. (fixed fittings incl).

ELECTRIC CRANES Duration Summer

01/05 to 30/09

Winter

01/ 10 to 30/04

Operation with no assistance*

(per operation)

1/2h 48.20 24,10
1h 92,00 46,00
Operation with assistance

(per operation)

1/2h 67,55 43,45
1h 130,70 84,70
Extra charge / assistance 1/2h 19,35
1h 38,70
Annual contract* from 01/01 to 31/12 1 an 398,00

*Authorized user only

The annual electric crane package includes access to self service crane for authorised users only.

If unauthorised, the operation will be possible only with the assistance of authorised user or Marina Staff (charged).