Further details on : +33(0)5 46 44 91 16 or grutage@portlarochelle.com
The rates are calculated L.O.A. (fixed fittings incl).
ELECTRIC CRANES | Duration | Summer
01/05 to 30/09 |
Winter
01/ 10 to 31/12 et 01/01 au 30/04 |
Operation with no assistance*
(per operation) |
1/2h | 49,40 | 24,70 |
Operation with assistance
(per operation) |
1/2h | 71,90 | 24,7 |
Annual contract* from 01/01 to 31/12 | 1 an | 408,00 |
*Authorized user only
The annual electric crane package includes access to self service crane for authorised users only.
If unauthorised, the operation will be possible only with the assistance of authorised user or Marina Staff (charged).